The Union Pacific Railroad operates modern power and equipment in Eastern Wyoming is featured on this 24x34 foot double tracked mainline on a double decked layout. The lower and upper decks are connected by a 90 inch wide, three loop, four track helix. The layout continues where Terry Kolenc’s Union Pacific Layout ends at the West portal of Hermosa Tunnel and continues on to Laramie and points West. This layout features an impressive 4x12 foot Walthers Ethanol Plant with completed scenery. Scenery is about 98% completed on the rest of the layout. The layout has working grade crossing signals and very active fire scene. Most of the building have had lights added. Signals are being added to the layout and will be operational by the time of the convention. A Digitrax Command Control System is being used.